| 1 |
Manufacturing Capability |
In-house capability for the required board type, including rigid, flex, rigid-flex, HDI, multilayer, or high-frequency PCB production. The facility should publish supported layer counts, finished copper ranges, minimum trace and spacing, board thickness, and maximum panel dimensions.
|
Current capability statement, engineering design rules, sample fabrication data, equipment list, and a completed design-for-manufacturing review.
|
Critical |
Capability information is vague, outsourced processes are not disclosed, or design rules are provided only after an order is placed.
|
| 2 |
Quality Management and Standards |
A documented quality management system certified to ISO 9001. Product inspection and acceptance should align with applicable IPC requirements, such as IPC-A-600 for printed board acceptability and IPC-6012 for qualification and performance of rigid printed boards.
|
Valid certificates with scope and expiry dates, quality manual excerpts, process-control plan, nonconformance procedure, and recent audit summary.
|
Critical |
Certificates are expired, the certificate scope excludes PCB manufacturing, or inspection criteria are described only as “industry standard.”
|
| 3 |
Testing and Traceability |
Suitable electrical and physical testing, including automated optical inspection, electrical test, dimensional inspection, solderability checks, and microsection analysis when required. Lot-level traceability should connect materials, processes, operators, inspection results, and shipment records.
|
Sample certificate of conformance, test coverage statement, test-failure analysis, material batch records, inspection reports, and retention policy for production data.
|
Critical |
No defined test coverage, no lot identification, no retained inspection data, or repeated requests for shipment without final test records.
|
| 4 |
Materials and Compliance |
Controlled laminate, copper foil, solder mask, surface finish, and chemical inputs with documented specifications. Export products should support applicable requirements such as RoHS and REACH, while flame-retardant claims should be supported by the relevant material documentation.
|
Material datasheets, supplier declarations, restricted-substance declarations, safety data sheets, certificates of analysis, and approved-material list.
|
High |
Material substitutions are made without approval, declarations are generic, or the supplier cannot identify the laminate manufacturer and material grade.
|
| 5 |
Capacity and Delivery Reliability |
A documented production schedule, realistic prototype and mass-production lead times, defined capacity allocation, and contingency planning for material shortages, equipment downtime, and peak-season demand.
|
Capacity overview, sample delivery-performance report, production scheduling process, escalation contacts, business-continuity plan, and agreed on-time-delivery target.
|
High |
Lead times are guaranteed without capacity evidence, delivery dates change frequently, or the manufacturer cannot explain its backup plan.
|
| 6 |
Engineering Support and Communication |
Responsive technical support for stack-up design, impedance control, DFM, panelization, via selection, surface finish, and manufacturability issues. Communication should include clear revision control and written approval before engineering changes.
|
Example engineering review, response-time commitment, revision-control procedure, approved drawing template, impedance report, and change-notification workflow.
|
High |
Engineering questions are handled only by sales staff, revisions are not tracked, or changes are implemented without written customer approval.
|
| 7 |
Global Procurement and Commercial Readiness |
Clear quotation structure, transparent tooling and testing charges, export documentation, secure packaging, agreed Incoterms® 2020, payment terms, warranty conditions, intellectual-property protection, and a defined process for corrective action.
|
Itemized quotation, sample commercial invoice and packing list, packaging specification, warranty terms, confidentiality agreement, corrective-action report, and approved shipping terms.
|
High |
Hidden charges appear after order confirmation, shipping responsibilities are unclear, or the supplier refuses written warranty and corrective-action terms.
|